Sutter Medical Center - Castro Valley

As part of a project team led by DPR, Clark Pacific collaboratively engineered, manufactured, and installed C-CAPP and GFRC panels for this new 130-bed acute care facility.  The project is one of the first Integrated Project Delivery (IPD) hospital projects in California.  The project team utilized BIM technologies and lean design, manufacturing, and construction principles to create streamlined schedules and seamless delivery.

 

Project Facts

Clark Pacific Job No: 497
City: Castro Valley
Architect: Devenney Group
General Contractor: DPR Construction
Structural Engineer: TTG (TMAD Taylor Gaines)
Owner: Sutter Health
Market: Healthcare
Building Type: Hospital
Square Feet of Product: 55,500 SF
Products Used: