Roseville City Hall Annex

Northern California

The Roseville City Hall Annex located at 316 Vernon Street is the first precast building constructed for the city of Roseville and the first to be rated and accredited by the United States Resiliency Council (USRC). The new four‐story office building with a gross area of approximately 82,000 square feet, sits on Roseville City square. The building provides space for the City of Roseville’s IT Department, Alternative Transportation Division, Parks Department and Fire Administration Division, as well as office and classroom space for the Sierra Joint Community College District.

“The City of Roseville is extremely pleased with the project outcome. Publicly-funded projects of this size, scope and complexity are rarely, if ever, completed in the time frame of 316 Vernon, due in significant part to the precast design and innovative just-in-time construction methods. Other added benefits from an operational perspective include: lower long-term maintenance costs, superior sound isolation / exterior noise suppression, and approximately 30% less energy consumption attributable to heating and cooling as a result of the building’s efficient thermal mass. As the owner and occupant, we couldn’t be happier.”

– Mike Isom, City of Roseville

 

The city office building’s original design called for a steel structure with a plaster finish. However, the City selected the Precast Hybrid Moment Frame because it gave the architect flexibility in the design, met its tight delivery requirements and provided the City with reassurance that during an earthquake, critical operations and services would be housed in a resilient structure.

The platinum rating is the highest rating from the USRC. It predicts the consequences of an earthquake on a building and projects the performance of the structure during the event, as well as the cost and time of structural recovery and repair. The PHMF structural system incorporates a high-performance precast hybrid moment-resisting frame that limits design level drifts to less than 1.25 percent.  The system is designed to be self-centering after the seismic event eliminating residual drifts, limiting damage, and providing for reduced recovery time.

“Precast is an ideal solution because most of the work is done off site…and in 38 days we had a building shell ready to go.”

– Mike Isom, City of Roseville

Additional Resources:

Roseville City Hall Annex – Case Study

GALLERY

Facts and Figures

State: CA

City: Roseville

Building Type: Office Building

Square Feet: 81,720

Year Completed: 2016

Job Number: 6063

Team

Owner

Architect

General Contractor

Structural Engineer

Products

Architectural Precast (APC), Complete Precast, Office

We have an obligation to our local taxpayers that we’re being as efficient as possible with the resources that we have available, getting the most out of our dollar, and Clark Pacific has gone a long way in helping us do that.

Related Projects

Prefabricated, Single Source Solutions for the Entire Building Envelope

Design-Manufacture-Build for the complete parking structure.

Our integrated office platform delivers a highly sustainable, energy-efficient office building solution.

Cover Roseville City Hall Annex Case Study

Download the Roseville City Hall Annex Case Study Today

Learn how prefabricated systems helped the City of Roseville meet its need for a larger civic center.

Clark Pacific horizontal colored logo