CALTRANS District 11 Headquarters

San Diego

The New State Highway and Transportation Headquarter consolidates existing functions and provides accommodation for current and future growth. The 11-acre site is located at the northern perimeter of the old town. The design for the State Building Project responds to three distinctive objectives including: respect for the community’s context and the site surroundings, accommodation for Department’s programmatic and public needs, and commitment to provide an elegant, sustainable and efficient solution for the City and the State. The project integrates planning and design goals with sustainability goals. Weaving sustainability strategies into what is essentially a governmental campus, the project is 16% below the state’s requirements for energy efficiency and it meets the standards for Silver LEED™ Rating.

Through collaborative design, advanced manufacturing and efficient construction, we transform the way buildings are delivered. Our people are paving the way for prefabrication as a smarter, safer and more efficient way to bring great designs to life, while reducing risk and providing owners with cost, schedule and scope certainty.

Clark Pacific

Facts and Figures

State: CA

City: San Diego

Building Type: Office Building

Square Feet: 83950

Year Completed: 2006

Job Number: 417

Products

Facades

Team

Architect

General Contractor

Structural Engineer

Owner

Facades

Single source solutions for the complete building envelope

Parking

Your Full-Service Partner for the Complete Parking Structure

Structural

Optimized Structural Components for the Entire Building

Build different. Achieve more. 

Clark Pacific is a leading manufacturer of prefabricated building systems. We are transforming design and construction by delivering high quality, cost effective buildings with less risk.

QUARTERLY Newsletter