Oracle Pleasanton Parking Garage

SF-Bay Area

As part of Oracle’s campus expansion in Pleasanton, a new structural steel office building and a post-tension concrete parking garage were added in 2009.

A four-story, 352,000 square foot parking garage is utilized by the entire corporate campus at the Hacienda Business Park. This four-level parking garage features 1,050 parking spaces and is enclosed by a sun-screen system. The structural system consists of one-way, cast-in-place, posttensioned concrete slabs supported on precast, pre-stressed concrete beams supported on concrete columns. The lateral load-resisting system utilizes cast-in-place concrete shear walls. The foundation system is shallow spread footings. This is the first of five parking structures for this office.

GALLERY

Through collaborative design, advanced manufacturing and efficient construction, we transform the way buildings are delivered. Our people are paving the way for prefabrication as a smarter, safer and more efficient way to bring great designs to life, while reducing risk and providing owners with cost, schedule and scope certainty.

Facts and Figures

State: CA

City: Pleasanton

Building Type: Parking Structure

Square Feet: 21133

Year Completed: 2009

Job Number: 1418

Team

Owner

Oracle Systems

Architect

General Contractor

Structural Engineer

Products

Parking

Related Projects

Alta Parking Structure

UC Berkeley Helen Diller Anchor House

Mineta San Jose International Airport Economy Parking Structure

Prefabricated, Single Source Solutions for the Entire Building Envelope

Design-Manufacture-Build for the complete parking structure.

Our integrated office platform delivers a highly sustainable, energy-efficient office building solution.