Busted: Debunking Common Prefabricated Parking Structure Myths

Despite the proven benefits of prefabrication, many owners choose cast-in-place construction based on negative misconceptions about the quality and resilience of precast elements.
What Are Grid Interactive Efficient Buildings, and Why Do They Matter?

To meet new energy-efficient goals, the new breed of high-performing buildings must combine energy efficiency and grid flexibility. That’s where grid interactive efficient buildings (GEBs) come in.
The PARC Process

Trust a single provider to design and build your next parking structure, refining the process to guarantee cost and schedule certainty. That’s PARC, Clark Pacific’s single source prefabricated parking solution.
Top 5 Reasons More Owners Are Choosing Prefabricated Parking Structures

In most parts of the U.S., prefabrication is the construction method of choice for parking garage owners who want more resilient, cost-effective parking structures. And in recent years, it’s been growing in popularity on the West Coast. What’s driving the increased interest?
3 + 1 = Why We Chose the Quadruple Bottom Line

The three pillars of sustainability provide a framework for applying a solutions-oriented approach to complicated sustainability issues such as those experienced in the construction industry.
Eye-Catching Aesthetics Boost Curb Appeal of New Student Dorm at Cal State LA

Student Housing East will offer 1,500 beds for freshmen and sophomore students along with a variety of indoor and outdoor spaces. The estimated $170 million project aims to provide residential experiences that allow students to collaborate, socialize, and interact in deep and impactful ways.
Fortinet Office Building Given Real Estate Structures Award – Office/R&D Build

Fortinet, a Sunnyvale-based network security company, is celebrating its commitment to sustainability with its move into a newly constructed 172,000 square-foot LEED Gold Net Zero office building. By using a precast structural system, the project was completed early, reducing construction time from over 24 months to just 20 months from start to finish.
Tower and Pedestrian Bridge Help Students Access ‘Higher’ Education

The site of the new Student Housing East dorms — three structurally separate buildings — and the adjoining but freestanding tower and pedestrian bridge had previously been a surface parking lot on the northeastern side of the campus, near the Interstate 710 freeway.