EPIC Sunset Tower

Infinite Facade Aesthetically Flexible to Create Geometric Design

With its unique staggered look, resembling a staircase of sorts, 5901 Sunset truly is epic. This building is located in Los Angeles and utilizes our Architectural Precast Concrete to create a beautiful exterior. The precast panels reduce in thickness to a minimum point at the center of the panel. This creates a panel cross section […]

Apple Park Office Building

Apple Park precast office building

This 2.8 million square foot, office building located in Cupertino, CA and designed by world-renowned architect Norman Foster (Foster + Partners) will house over 14,000 employees in one central four-storied office building when completed. The building includes two levels of underground parking, as well as two stand-along parking structures. Sometimes likened to a spaceship, the […]

Hyundai Motors America Corporate Headquarters

Hyundai Motors America Corporate Headquarter

Hyundai Motors Expresses Brand Image with Architectural Precast Gensler designed a corporate headquarters campus for Hyundai Motors America that represented a long-term commitment to the local community and reflected the company’s core values including connectivity, transparency, and innovation.  The company’s brand image was amplified in the floating design and clean lines exuding sustainability, harmony and […]

The Business Case for LEAN Construction… There is a better way!

How do you increase speed to market and/ or improve the return on investment of your capital projects? The Lean Construction Institute sponsored two separate research studies, conducted by Dodge Data & Analytics and the University of Minnesota, to explore how and why projects excel. Empirical evidence now shows that projects with high Lean intensity are […]

Moffett Park Parking Structure (Garage B)

Moffett Park Parking Structure

318,033 square feet of total precast building that consists of a basement level and four levels above grade. This Design Build parking structure was built on a uniquely shaped existing parking lot adjacent to VTA tracks, that incorporated architecturally-finished structural panels (archi-structural) to accommodate the larger working population of the Moffett Park Campus. From a preliminary layout developed by the campus architect, Clark […]

Caltrans District 3 Headquarters

California Precast Office Building

First California State Office Building to feature state-of-the-art Precast Hybrid Moment Frame. Total precast structure features integrated architectural finishes of multi-colors, forms, and thin brick.

SV5 Data Center

SV5 Data Center Precast Concrete

Leading data centers take advantage of precast’s durability and design flexibility.