EPIC Sunset Tower

Infinite Facade Aesthetically Flexible to Create Geometric Design

With its unique staggered look, resembling a staircase of sorts, EPIC Sunset (5901 Sunset) is truly epic. This building is located in Los Angeles and utilizes our Architectural Precast Concrete to create a beautiful exterior. The precast panels reduce in thickness to a minimum point at the center of the panel. This creates a panel […]

Nickelodeon Parking Structure

For general contractors working on Design-Bid-Build projects, proposing alternative solutions can be a risky endeavor once plans are already in place. However, the Nickelodeon Parking Structure project took an exciting turn when McCormick Construction and Clark Pacific collaborated to present a groundbreaking all-in-one precast design to the owners, Accord Interests, LLC. Upon reviewing the proposed […]

Apple Park Office Building

Apple Park precast office building

This 2.8 million square foot, office building located in Cupertino, CA and designed by world-renowned architect Norman Foster (Foster + Partners) houses over 14,000 employees in one central four-storied office building. The building includes two levels of underground parking, as well as two stand-along parking structures. Sometimes likened to a spaceship, the iconic circular office […]

Apple Park Parking Structures

Apple Park Parking Structures

When Apple decided to consolidate all of its 50 remote working facilities across the Bay Area, new parking facilities were needed to accommodate the roughly 14,000 employees now working at the new centrally located headquarters, and largest office building in the world. The result was two free-standing parking structures, each providing 3,000 parking stalls, each […]

Hyundai Motors America Corporate Headquarters

Hyundai Motors America Corporate Headquarter

Hyundai Motors Expresses Brand Image with Architectural Precast Gensler designed a corporate headquarters campus for Hyundai Motors America that represented a long-term commitment to the local community and reflected the company’s core values including connectivity, transparency, and innovation.  The company’s brand image was amplified in the floating design and clean lines exuding sustainability, harmony and […]

The Business Case for LEAN Construction… There is a better way!

How do you increase speed to market and/ or improve the return on investment of your capital projects? The Lean Construction Institute sponsored two separate research studies, conducted by Dodge Data & Analytics and the University of Minnesota, to explore how and why projects excel. Empirical evidence now shows that projects

Moffett Park Parking Structure (Garage B)

Moffett Park Parking Structure

318,033 square feet of total precast building that consists of a basement level and four levels above grade. This Design Build parking structure was built on a uniquely shaped existing parking lot adjacent to VTA tracks, that incorporated architecturally-finished structural panels (archi-structural) to accommodate the larger working population of the Moffett Park Campus. From a preliminary layout developed by the campus architect, Clark […]

Caltrans District 3 Headquarters

California Precast Office Building

First California State Office Building to feature state-of-the-art Precast Hybrid Moment Frame. Total precast structure features integrated architectural finishes of multi-colors, forms, and thin brick.